VDL has a new production site in Roeselare, and Verhelst Aannemingen was able to contribute to it. As a subcontractor for Alheembouw, we worked on various aspects of the project.

Back to overview

A realization of

Thus, we were responsible for leveling the groundwork, placing concrete and mixed rubble in the respective areas. We installed the indoor and outdoor sewage systems as well as the ducts and completed the environmental work.

The environmental work includes placing curbstones (prefab and silt form), laying pavers, providing planting areas and a large part of the parking lot was asphalted by us down to the smallest detail.  

Below are some impressive figures about this project:

  • Site area/new VDL site: 77,000 m²
  • Built-up area is 27,500 m²
  • The external paving (asphalt, concrete, crushed stone 0/20, permeable pavers and water-passing pavers) is 42,000 m². 
  • Green zone is 7,800 m².
  • 6,500 m² of water-passing pavers.
  • 1,200 m² of permeable pavers.
  • 17,000 m² of asphalt.
  • More than 40,000 tons of mixed rubble and concrete rubble was delivered.
  • More than 10 km of sewer pipes and waiting pipes were installed. 

Curious about what we can do for your project? Request a non-binding consultation.